This paper compares MILP and CP solvers on a new FJS scheduling problem, showing CP is faster and "warm starts" are vital for large instances.This paper compares MILP and CP solvers on a new FJS scheduling problem, showing CP is faster and "warm starts" are vital for large instances.

The Tortoise and the Hare: An Unexpected Scheduling Race Between MILP and CP Solvers

Abstract and 1. Introduction

  1. Mixed integer and constraint programming models

    2.1 Mixed-integer linear programming model

    2.2 Constraint Programming model

  2. Constructive Heuristics

  3. Benchmark instances

  4. Numerical experiments

    5.1 Experiments with the constructive heuristics

    5.2 Solving the proposed models with a commercial solver

  5. Conclusions and References

5.2 Solving the proposed models with a commercial solver

In this section, we apply an exact solver to the 330 instances considered and evaluate the quality of the solutions found within a given CPU time limit, depending on whether we provide the solution found by the constructive heuristics as an initial solution or not. Since there is no clear winner between the two constructive heuristics and their execution time is negligible, we run both and give the best of the two as initial solution to the exact solver. In the tables and figures, the solvers’ runs that receive as input a solution computed by one of the constructive heuristics are identified with the expression “warm start”.

\

\ Tables 5, 6, 7, 8, 9, and 10 show the results in detail when the warm start is not taken into account. Tables 5, 6, and 7 correspond to the small-sized instances with α equal to 0.1, 0.2, and 0.3, respectively; while Tables 8, 9, and 10 show the same thing for the large-sized instances. Tables 11–16 show the results when the warm start is taken into account. The tables show the information related to the resolution of the MILP and CP models. When a single number appears in the “makespan” column, it means that a provably optimal solution with that makespan value was found. When instead of a number an expression of the form [A, B] C% appears, it means that a feasible solution was found with value B for the makespan, value A for a lower bound on the makespan, and gap C equal to 100(B − A)/B. As measures of computational effort, for the MILP solver the tables show the number of iterations, the number of nodes explored in the branch-and-bound search tree, and the CPU time in seconds. For the CP solver, the tables show the number of branches and the CPU time in seconds. If no information is displayed for a particular instance, it means that the solver was unable to find a feasible solution within the specified CPU time limit. In Tables 11–16, which show results with warm start, the symbol † next to the optimal or best value found means that the exact method returned exactly the same solution computed with the constructive heuristic and given as initial solution. The information from Tables 11–16 is presented graphically in Figure 6.

\ Let’s look at the small-sized instances first. Without warm start, the exact methods found provably optimal solutions for 168 instances of the MILP model and 169 instances of the CP model (out of a total of 180 small-sized instances). In the remaining cases, the gaps for the MILP model instances were between 0.17% and 23.32%, while for the CP model instances the gaps were between 29.44% and 47.55%. It is worth noting that in the few cases without a proven optimal solution, there is a slight advantage in the best solution found for the CP model instances and a slight advantage in the lower bounds found for the MILP model instances. In the instances where a proven solution was found by solving both the MILP model and the CP model, the CP solver was on average 12.09% faster than the MILP solver. When the constructive heuristics solution is made available to the exact solvers, the number of proven optimal solutions found hardly changes (still the same number for MILP model instances and one less for CP model instances, not necessarily the same as those solved without the warm start). However, for MILP model instances where a proven optimal solution is found both with and without warm start, the use of warm start reduces the solution time by 32.52% in average. This reduction is 4.44% for the CP model solver. One way or another, whether using the MILP model or the CP model, with or without warm start, it was possible to find provably optimal solutions in 176 (out of 180) small-sized instances.

\ The analysis of the 150 large-sized instances is a little different. Without a warm start, the exact methods were able to find proven optimal solutions for only 7 instances of the MILP model and 5 instances of the CP model. In 70 MILP model instances it was possible to find feasible solutions with gaps between 13.94% and 90.47%, while feasible solutions with gaps between 9.30% and 86.10% were found in 145 instances of the CP model. In 73 instances of the MILP model, not a single feasible solution was found. In the 70 instances in which feasible solutions from both the MILP and CP models were found, the solutions found using the CP model were on average 68.85% better. It was after observing these results that the idea arose to develop constructive heuristics to test the warm start and consider a set of smaller instances.

\ When the solution of the constructive heuristics is fed to the exact solver, 6 provably optimal solutions and 144 feasible solutions are obtained with gaps between 5.65% and 64.36% for MILP model instances. For the CP model instances, the same number of provably optimal and feasible solutions are found, with gaps between 15.43% and 81.06% for the feasible ones. In those instances where a proven optimal solution is found without and with warm start, warm start increases the computational cost of solving the MILP and CP models by 9.69% and 25.99%, respectively. On the other hand, in the MILP model instances in which a feasible solution was found without the use of warm start, the use of warm start improved the quality of the feasible solution found by 49.46%. For the CP model instances, this improvement was 11.53%. In the 144 instances in which feasible solutions from both the MILP and CP models were found, the solutions found using the CP model were on average 6.82% better. The question remains as to whether the exact methods are able to improve the solution provided by the constructive heuristics or whether the statistics improve only because the solvers return the solution they received as input. In the case of the MILP model instances, the initial solution is improved in 33 problems, while in the CP model instances the initial solution is improved in 134 problems. Without a warm start, in the instances where it is possible to find a provably optimal solution for both the MILP model and the CP model (5 instances), the cost of solving the CP models is 70.81% lower. In the case where provably optimal solutions are found in both cases using warm start (6 instances), the cost of solving the CP models is 41.86% lower. In short, it is challenging to find a proven optimal solution for large-sized instances, solving CP model instances costs less, CP models provide better quality feasible solutions when it is not possible to find a provably optimal solution, and solving MILP models provides better quality lower bounds. One way or another, whether using the MILP model or the CP model, with or without warm start, it was possible to find provably optimal solutions in only 7 large-sized instances and feasible solutions in all the remaining 143 large-sized instances.

\

6 Conclusions

In this work, we addressed the FJS scheduling problem with sequencing flexibility and positionbased learning effect. To the authors’ knowledge, this combination, with potential application in a wide range of real-world industrial environments, has never been addressed in the literature. As a first step towards its efficient and effective solution, we introduced a set of 110 instances that transform into 330 instances by varying the learning rate α ∈ {0.1, 0.2, 0.3}. By introducing MILP and CP models, an exact solver aided by constructive heuristics was able to provide 183 proven optimal solutions. Instances, their solutions, models and constructive heuristics are all available for download at https://github.com/kennedy94/FJS. We expect this benchmark test-set to guide the introduction and evaluation of new effective heuristic and metaheuristic approaches for the considered problem. In fact, this is the current line of research of the authors.

\ Conflict of interest statement: On behalf of all authors, the corresponding author states that there is no conflict of interest.

\ Data availability: The datasets generated during and/or analysed during the current study are available in the GitHub repository, https://github.com/kennedy94/FJS.

\

References

[1] R. Alvarez-Valdes, A. Fuertes, J. M. Tamarit, G. Gim´enez, and R. Ramos. A heuristic to schedule flexible job-shop in a glass factory. European Journal of Operational Research, 165(2):525–534, 2005.

\ [2] J. L. Andrade-Pineda, D. Canca, P. L. Gonzalez-R, and M. Calle. Scheduling a dualresource flexible job shop with makespan and due date-related criteria. Annals of Operations Research, 291(1):5–35, 2020.

\ Figure 6: Graphical representation of the information contained in Tables 6–16. The figures at the top, middle and bottom correspond to α equal to 0.1, 0.2, and 0.3, respectively. Each figure shows, for each large-sized size instance, the solution found by solving the MILP and CP models with and without warm start, as well as the lower bounds found in these 4 cases. The numbers from 1 to 50 on the abscissa axis correspond to the 50 large-sized instances in the order presented in all the tables. That is, the instances from 1 to 30 correspond to the instances DAFJS01, . . . , DAFJS30 and the instances from 31 to 50 correspond to the instances YFJS01, . . . , YFJS20.

\ [3] A. Azzouz, M. Ennigrou, and L. Ben Said. Scheduling problems under learning effects: classification and cartography. International Journal of Production Research, 56(4):1642– 1661, 2017.

\ [4] E. G. Birgin, P. Feofiloff, C. G. Fernandes, E. L. De Melo, M. T. I. Oshiro, and D. P. Ronconi. A MILP model for an extended version of the flexible job shop problem. Optimization Letters, 8(4):1417–1431, 2014.

\ [5] E. G. Birgin, J. E. Ferreira, and D. P. Ronconi. List scheduling and beam search methods for the flexible job shop scheduling problem with sequencing flexibility. European Journal of Operational Research, 247(2):421–440, 2015.

\ [6] D. Biskup. Single-machine scheduling with learning considerations. European Journal of Operational Research, 115(1):173–178, 1999.

\ [7] D. Biskup. A state-of-the-art review on scheduling with learning effects. European Journal of Operational Research, 188(2):315–329, 2008.

\ [8] Z.-C. Cao, C.-R. Lin, and M.-C. Zhou. A knowledge-based cuckoo search algorithm to schedule a flexible job shop with sequencing flexibility. IEEE Transactions on Automation Science and Engineering, 18(1):56–69, 2021.

\ [9] T. C. E. Cheng and G. Wang. Single machine scheduling with learning effect considerations. Annals of Operations Research, 98(1/4):273–290, 2000.

\ [10] T. H. Cormen, C. E. Leiserson, R. L. Rivest, and C. Stein. Introduction to Algorithms. The MIT Press, Cambridge, MA, USA, 4th edition, 2022.

\ [11] P. Y. Gan and K. S. Lee. Scheduling of flexible-sequenced process plans in a mould manufacturing shop. The International Journal of Advanced Manufacturing Technology, 20(3):214– 222, 2002.

\ [12] J. Gao, M. Gen, and L. Sun. Scheduling jobs and maintenances in flexible job shop with a hybrid genetic algorithm. Journal of Intelligent Manufacturing, 17(4):493–507, 2006.

\ [13] M. R. Garey, D. S. Johnson, and R. Sethi. The complexity of flowshop and jobshop scheduling. Mathematics of Operations Research, 1(2):117–129, 1976.

\ [14] J. N. D. Gupta and S. K. Gupta. Single facility scheduling with nonlinear processing times. Computers and Industrial Engineering, 14(4):387–393, 1988.

\ [15] A. Janiak, T. Krysiak, and R. Trela. Scheduling problems with learning and ageing effects: A survey. Decision Making in Manufacturing and Services, 5(1):19–36, 2011.

\ [16] G. A. Kasapidis, S. Dauzere-Pees, D. C. Paraskevopoulos, P. P. Repoussis, and C. D. Tarantilis. On the multiresource flexible job-shop scheduling problem with arbitrary precedence graphs. Production and Operations Management, 32(7):2322–2330, 2023.

\ [17] G. A. Kasapidis, D. C. Paraskevopoulos, P. P. Repoussis, and C. D. Tarantilis. Flexible job shop scheduling problems with arbitrary precedence graphs. Production and Operations Management, 30(11):4044–4068, 2021.

\ [18] Y. K. Kim, K. Park, and J. Ko. A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling. Computers and Operations Research, 30(8):1151– 1171, 2003.

\ [19] P. Laborie, J. Rogerie, P. Shaw, and P. Vil´ım. IBM ILOG CP optimizer for scheduling: 20+ years of scheduling with constraints at ibm/ilog. Constraints, 23(2):210–250, 2018.

\ [20] J. Y.-T. Leung, H. Li, and M. Pinedo. Order scheduling in an environment with dedicated resources in parallel. Journal of Scheduling, 8(5):355–386, 2005.

\ [21] W. T. Lunardi, E. G. Birgin, P. Laborie, D. P. Ronconi, and H. Voos. Mixed integer linear programming and constraint programming models for the online printing shop scheduling problem. Computers and Operations Research, 123:105020, 2020.

\ [22] W. T. Lunardi, E. G. Birgin, D. P. Ronconi, and H. Voos. Metaheuristics for the online printing shop scheduling problem. European Journal of Operational Research, 293(2):419– 441, 2021.

\ [23] G. Vilcot and J.-C. Billaut. A tabu search and a genetic algorithm for solving a bicriteria general job shop scheduling problem. European Journal of Operational Research, 190(2):398–411, 2008.

\ [24] A. Vital-Soto, A. Azab, and M. F. Baki. Mathematical modeling and a hybridized bacterial foraging optimization algorithm for the flexible job-shop scheduling problem with sequencing flexibility. Journal of Manufacturing Systems, 54:74–93, 2020.

\ [25] H. M. Wagner. An integer linear-programming model for machine scheduling. Naval Research Logistics Quarterly, 6(2):131–140, 1959.

\ [26] J. M. Wilson. Alternative formulations of a flow-shop scheduling problem. Journal of the Operational Research Society, 40(4):395–399, 1989.

\ [27] L. Yu, C. Zhu, J. Shi, and W. Zhang. An extended flexible job shop scheduling model for flight deck scheduling with priority, parallel operations, and sequence flexibility. Scientific Programming, 2017:1–15, 2017.

\ Table 3: Makespan values for the small-sized set of instance solved by constructive heuristics.

\ Table 4: Makespan values for the testbed set of instance solved by constructive heuristics.

\ Table 5: Solutions found and computational cost of solving the small-sized instances with learning rate α = 0.1 using CPLEX and CP Optimizer with no warm start.

\ Table 6: Solutions found and computational cost of solving the small-sized instances with learning rate α = 0.2 using CPLEX and CP Optimizer with no warm start.

\ Table 7: Solutions found and computational cost of solving the small-sized instances with learning rate α = 0.3 using CPLEX and CP Optimizer with no warm start.

\ Table 8: Solutions found and computational cost of solving the large-sized instances with learning rate α = 0.1 using CPLEX and CP Optimizer with no warm start.

\ Table 9: Solutions found and computational cost of solving the large-sized instances with learning rate α = 0.2 using CPLEX and CP Optimizer with no warm start.

\ Table 10: Solutions found and computational cost of solving the large-sized instances with learning rate α = 0.3 using CPLEX and CP Optimizer with no warm start.

\ Table 11: Solutions found and computational cost of solving the small-sized instances with learning rate α = 0.1 using CPLEX and CP Optimizer with warm start.

\ Table 12: Solutions found and computational cost of solving the small-sized instances with learning rate α = 0.2 using CPLEX and CP Optimizer with warm start.

\ Table 13: Solutions found and computational cost of solving the small-sized instances with learning rate α = 0.3 using CPLEX and CP Optimizer with warm start.

\ Table 14: Solutions found and computational cost of solving the large-sized instances with learning rate α = 0.1 using CPLEX and CP Optimizer with warm start.

\ Table 15: Solutions found and computational cost of solving the large-sized instances with learning rate α = 0.2 using CPLEX and CP Optimizer with warm start.

\ Table 16: Solutions found and computational cost of solving the large-sized instances with learning rate α = 0.3 using CPLEX and CP Optimizer with warm start.

\

:::info Authors:

(1) K. A. G. Araujo, Department of Applied Mathematics, Institute of Mathematics and Statistics, University of Sao Paulo, Rua do Matao, 1010, Cidade Universitaria, 05508-090, Sao Paulo, SP, Brazil (kennedy94@ime.usp.br);

(2) E. G. Birgin, Department of Computer Science, Institute of Mathematics and Statistics, University of Sao Paulo, Rua do Matao, 1010, Cidade Universitaria, 05508-090, Sao Paulo, SP, Brazil (gbirgin@ime.usp.br);

(3) D. P. Ronconi, Department of Production Engineering, Polytechnic School, University of Sao Paulo, Av. Prof. Luciano Gualberto, 1380, Cidade Universitaria, 05508-010 Sao Paulo, SP, Brazil (dronconi@usp.br).

:::


:::info This paper is available on arxiv under CC by 4.0 Deed (Attribution 4.0 International) license.

:::

\

Disclaimer: The articles reposted on this site are sourced from public platforms and are provided for informational purposes only. They do not necessarily reflect the views of MEXC. All rights remain with the original authors. If you believe any content infringes on third-party rights, please contact service@support.mexc.com for removal. MEXC makes no guarantees regarding the accuracy, completeness, or timeliness of the content and is not responsible for any actions taken based on the information provided. The content does not constitute financial, legal, or other professional advice, nor should it be considered a recommendation or endorsement by MEXC.

You May Also Like

Report: Galaxy to Launch $100 Million Crypto Hedge Fund in Q1

Report: Galaxy to Launch $100 Million Crypto Hedge Fund in Q1

The post Report: Galaxy to Launch $100 Million Crypto Hedge Fund in Q1 appeared on BitcoinEthereumNews.com. Galaxy is launching a $100 million hedge fund to trade
Share
BitcoinEthereumNews2026/01/21 19:49
Lovable AI’s Astonishing Rise: Anton Osika Reveals Startup Secrets at Bitcoin World Disrupt 2025

Lovable AI’s Astonishing Rise: Anton Osika Reveals Startup Secrets at Bitcoin World Disrupt 2025

BitcoinWorld Lovable AI’s Astonishing Rise: Anton Osika Reveals Startup Secrets at Bitcoin World Disrupt 2025 Are you ready to witness a phenomenon? The world of technology is abuzz with the incredible rise of Lovable AI, a startup that’s not just breaking records but rewriting the rulebook for rapid growth. Imagine creating powerful apps and websites just by speaking to an AI – that’s the magic Lovable brings to the masses. This groundbreaking approach has propelled the company into the spotlight, making it one of the fastest-growing software firms in history. And now, the visionary behind this sensation, co-founder and CEO Anton Osika, is set to share his invaluable insights on the Disrupt Stage at the highly anticipated Bitcoin World Disrupt 2025. If you’re a founder, investor, or tech enthusiast eager to understand the future of innovation, this is an event you cannot afford to miss. Lovable AI’s Meteoric Ascent: Redefining Software Creation In an era where digital transformation is paramount, Lovable AI has emerged as a true game-changer. Its core premise is deceptively simple yet profoundly impactful: democratize software creation. By enabling anyone to build applications and websites through intuitive AI conversations, Lovable is empowering the vast majority of individuals who lack coding skills to transform their ideas into tangible digital products. This mission has resonated globally, leading to unprecedented momentum. The numbers speak for themselves: Achieved an astonishing $100 million Annual Recurring Revenue (ARR) in less than a year. Successfully raised a $200 million Series A funding round, valuing the company at $1.8 billion, led by industry giant Accel. Is currently fielding unsolicited investor offers, pushing its valuation towards an incredible $4 billion. As industry reports suggest, investors are unequivocally “loving Lovable,” and it’s clear why. This isn’t just about impressive financial metrics; it’s about a company that has tapped into a fundamental need, offering a solution that is both innovative and accessible. The rapid scaling of Lovable AI provides a compelling case study for any entrepreneur aiming for similar exponential growth. The Visionary Behind the Hype: Anton Osika’s Journey to Innovation Every groundbreaking company has a driving force, and for Lovable, that force is co-founder and CEO Anton Osika. His journey is as fascinating as his company’s success. A physicist by training, Osika previously contributed to the cutting-edge research at CERN, the European Organization for Nuclear Research. This deep technical background, combined with his entrepreneurial spirit, has been instrumental in Lovable’s rapid ascent. Before Lovable, he honed his skills as a co-founder of Depict.ai and a Founding Engineer at Sana. Based in Stockholm, Osika has masterfully steered Lovable from a nascent idea to a global phenomenon in record time. His leadership embodies a unique blend of profound technical understanding and a keen, consumer-first vision. At Bitcoin World Disrupt 2025, attendees will have the rare opportunity to hear directly from Osika about what it truly takes to build a brand that not only scales at an incredible pace in a fiercely competitive market but also adeptly manages the intense cultural conversations that inevitably accompany such swift and significant success. His insights will be crucial for anyone looking to understand the dynamics of high-growth tech leadership. Unpacking Consumer Tech Innovation at Bitcoin World Disrupt 2025 The 20th anniversary of Bitcoin World is set to be marked by a truly special event: Bitcoin World Disrupt 2025. From October 27–29, Moscone West in San Francisco will transform into the epicenter of innovation, gathering over 10,000 founders, investors, and tech leaders. It’s the ideal platform to explore the future of consumer tech innovation, and Anton Osika’s presence on the Disrupt Stage is a highlight. His session will delve into how Lovable is not just participating in but actively shaping the next wave of consumer-facing technologies. Why is this session particularly relevant for those interested in the future of consumer experiences? Osika’s discussion will go beyond the superficial, offering a deep dive into the strategies that have allowed Lovable to carve out a unique category in a market long thought to be saturated. Attendees will gain a front-row seat to understanding how to identify unmet consumer needs, leverage advanced AI to meet those needs, and build a product that captivates users globally. The event itself promises a rich tapestry of ideas and networking opportunities: For Founders: Sharpen your pitch and connect with potential investors. For Investors: Discover the next breakout startup poised for massive growth. For Innovators: Claim your spot at the forefront of technological advancements. The insights shared regarding consumer tech innovation at this event will be invaluable for anyone looking to navigate the complexities and capitalize on the opportunities within this dynamic sector. Mastering Startup Growth Strategies: A Blueprint for the Future Lovable’s journey isn’t just another startup success story; it’s a meticulously crafted blueprint for effective startup growth strategies in the modern era. Anton Osika’s experience offers a rare glimpse into the practicalities of scaling a business at breakneck speed while maintaining product integrity and managing external pressures. For entrepreneurs and aspiring tech leaders, his talk will serve as a masterclass in several critical areas: Strategy Focus Key Takeaways from Lovable’s Journey Rapid Scaling How to build infrastructure and teams that support exponential user and revenue growth without compromising quality. Product-Market Fit Identifying a significant, underserved market (the 99% who can’t code) and developing a truly innovative solution (AI-powered app creation). Investor Relations Balancing intense investor interest and pressure with a steadfast focus on product development and long-term vision. Category Creation Carving out an entirely new niche by democratizing complex technologies, rather than competing in existing crowded markets. Understanding these startup growth strategies is essential for anyone aiming to build a resilient and impactful consumer experience. Osika’s session will provide actionable insights into how to replicate elements of Lovable’s success, offering guidance on navigating challenges from product development to market penetration and investor management. Conclusion: Seize the Future of Tech The story of Lovable, under the astute leadership of Anton Osika, is a testament to the power of innovative ideas meeting flawless execution. Their remarkable journey from concept to a multi-billion-dollar valuation in record time is a compelling narrative for anyone interested in the future of technology. By democratizing software creation through Lovable AI, they are not just building a company; they are fostering a new generation of creators. His appearance at Bitcoin World Disrupt 2025 is an unmissable opportunity to gain direct insights from a leader who is truly shaping the landscape of consumer tech innovation. Don’t miss this chance to learn about cutting-edge startup growth strategies and secure your front-row seat to the future. Register now and save up to $668 before Regular Bird rates end on September 26. To learn more about the latest AI market trends, explore our article on key developments shaping AI features. This post Lovable AI’s Astonishing Rise: Anton Osika Reveals Startup Secrets at Bitcoin World Disrupt 2025 first appeared on BitcoinWorld.
Share
Coinstats2025/09/17 23:40
SHIB Price Drops as Leadership Concerns Grow

SHIB Price Drops as Leadership Concerns Grow

The post SHIB Price Drops as Leadership Concerns Grow appeared on BitcoinEthereumNews.com. Shiba Inu investors uneasy as Kusama’s silence fuels leadership concerns. SHIB slid 13% in three days, retracing from $0.00001484 to $0.00001305. Shibarium exploit and Kusama’s absence have weighed on investor trust. Shiba Inu investors are voicing concerns about the project’s long-term direction as leadership uncertainty and slow ecosystem progress erode confidence.  The token, which rallied from its meme-coin origins to become the second-largest meme asset by market cap, counts more than 1.5 million holders worldwide. But as SHIB matures, the gap between early hype and current delivery has widened.  The project’s transition into an “ecosystem coin” with spin-off projects and Shibarium, its layer-2 network, once raised expectations. Analysts now point to internal challenges as the main factor holding SHIB back from fulfilling that potential. Kusama’s Silence Adds to Instability Central to the debate is the role of Shytoshi Kusama, Shiba Inu’s pseudonymous lead developer. Investors are concerned about the intermittent disappearance of the project’s lead developer, who repeatedly takes unannounced social media breaks.  For instance, Kusama went silent on X for over a month before resurfacing this week amid growing speculation that he had abandoned the Shiba Inu project.  Kusama returned shortly after the Shibarium bridge suffered an exploit worth around $3 million. However, he did not directly address the issue but only reassured Shiba Inu community members of his commitment to advancing the project.  Although most community members didn’t complain about Kusama’s anonymity in the project’s initial stages, his recent behavior has raised concerns. Many are beginning to develop trust issues, particularly because nobody could reveal the SHIB developer’s identity for the past five years. He has conducted all communications under pseudonyms. SHIB Price Action Reflects Sentiment Shift Market reaction has mirrored the doubts. SHIB, which spiked 26% at the start of September, has since reversed. Over the last…
Share
BitcoinEthereumNews2025/09/18 04:13